Road closes as Clocaenog Forest Wind Farm work starts 9 Apr 2018

A road linking the Clocaenog Forest to the B4501 and B5435 has closed to allow workers’ access to a wind farm development. Jones Bros Civil Engineering UK is working on the unnamed road from the [read more]

Jones Bros

Jones Bros secures place on FCC waste management framework 4 Apr 2018

Jones Bros Civil Engineering UK has secured a place on a £15m per year waste management and landfill framework covering the UK. FCC Environment UK awarded the contract to Jones Bros because of the family [read more]

Jones Bros wins circa £20million contract to help build Clocaenog Forest Wind Farm 19 Mar 2018

Leading UK civil engineering contractor Jones Bros is celebrating its appointment to build the infrastructure for Clocaenog Forest Wind Farm. And the contract from renewable energy developer innogy Renewables UK has particular meaning for the [read more]

Jones Bros

Place on Viridor’s landfill framework leads to immediate success for Jones Bros 5 Mar 2018

Jones Bros Civil Engineering UK’s place on a waste management and landfill framework has got off to a flying start. The family firm has already completed four projects on behalf of Viridor, a recycling, renewable [read more]

Construction of vital highway link gets under way 2 Mar 2018

Work on the final section of a vital link road has been started by Jones Bros Civil Engineering UK. The design and build contract is for the fourth phase of Llangefni Link Road, in the [read more]

Jones Bros

Marine reclamation work starts at major UK port 28 Feb 2018

Infrastructure improvement works including land reclamation, earthworks and surfacing to improve the site layout, and safety at Holyhead Port is being carried out by Jones Bros Civil Engineering UK. The project will improve the service [read more]

Jones Bros

Turbine bases at Brenig completed ahead of schedule 9 Feb 2018

Snow and other wintry conditions have failed to slow work constructing infrastructure at Brenig wind farm. Construction of the concrete foundations for the 16-turbine scheme, was finished two weeks ahead of the planned programme. Now, [read more]

Jones Bros

Civil engineering work on Cheshire highways project attracts praise from local business 8 Feb 2018

Jones Bros Civil Engineering UK has finished works on the A51 as part of infrastructure for a £100m industrial park. A team of 10 from Jones Bros has been on site for 4 months installing [read more]

Pioneering tidal energy base built by North Wales firm 1 Feb 2018

The bespoke concrete base for a pioneering underwater renewable energy project is set to be floated across the coast of North Wales. The structure, which is part of a €30m (£25m) underwater kite project off [read more]

Jones Bros

Jones Bros overcomes geotechnical challenges as Pen Bryn Oer nears completion 11 Jan 2018

The final turbine has been erected at Pen Bryn Oer Wind Farm in South Wales. Contractor Jones Bros Civil Engineering UK is now carrying out reinstatement work on the site ahead of the three-turbine wind [read more]

info@jones-bros-ruthin.co.uk
civeng@jones-bros-ruthin.co.uk
southern@jones-bros-ruthin.co.uk
scotland@jones-bros-ruthin.co.uk